Future Trends in Civil Engineering 2019
DOI: 10.5592/co/ftce.2019.10
|View full text |Cite
|
Sign up to set email alerts
|

Pelješac bridge – design and maintenance

Abstract: The Pelješac Bridge is currently the largest bridge under construction in Croatia and in the wider region. The construction began in July 2018 (for the second time), and the bridge should be completed in 36 months. The design work for the bridge started in 2004. Various bridge alternatives were considered during preliminary studies, preliminary design and main design activities. The bridge is located in a high-activity seismic zone with strong winds, and is realised in extremely adverse foundation soil conditi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 2 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?