2021
DOI: 10.35814/janata.v1i1.2345
|View full text |Cite
|
Sign up to set email alerts
|

Pembangunan Infrastruktur Jembatan di Kampung Baragajed dan Kampung Pasir Salam

Abstract: Jembatan merupakan struktur bangunan yang dibuat untuk menghubungkan rute/lintasan transportasi yang terputus oleh sungai, danau, saluran ataupun jalan raya. Desa Leuwisadeng merupakan salah satu desa yang terletak di kabupaten Bogor yang membutuhkan pembangunan renovasi infrastruktur jembatan. Pembangunan renovasi infrastruktur jembatan di daerah leuwisadeng ini didasarkan akan kebutuhan suatu prasarana transportasi yang menghubungkan kampung baragajed dengan kampung pasir salam. Kondisi jembatan yang berada … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The class was "high fit" (S1), the class was "suitable that is enough" (S2), the class was "suitable with conditionals" (S3), and the class was "not suitable" (N) [37], and rely on the previous studies literature based on quality range value references (Table 1). Analyse to determine among suitable class intervals, the following formula was used [39,40,37]: I = ((Nmax-Nmin/K)), where: I is the class interval; K is the desired land number of suitability classes; N max is the maximum final value; Nmin is the minimum final value. Further, the class intervals and fitness values are obtained based on the above formulas and calculations in Table 1.…”
Section: Data Collection Techniquementioning
confidence: 99%
“…The class was "high fit" (S1), the class was "suitable that is enough" (S2), the class was "suitable with conditionals" (S3), and the class was "not suitable" (N) [37], and rely on the previous studies literature based on quality range value references (Table 1). Analyse to determine among suitable class intervals, the following formula was used [39,40,37]: I = ((Nmax-Nmin/K)), where: I is the class interval; K is the desired land number of suitability classes; N max is the maximum final value; Nmin is the minimum final value. Further, the class intervals and fitness values are obtained based on the above formulas and calculations in Table 1.…”
Section: Data Collection Techniquementioning
confidence: 99%