Many studies have been conducting in providing urban floods solutions to reduce runoff water in various ways. In developing urban areas equipped with drainage systems, where the channel has full capacity and flooding in some urban areas. One of the problems that can be identified is the condition where drainage has a peak flow load at the same hour leading to the same meeting point, outlet, or discharge, resulting in an increase of peak flow. This paper give an approach to how to integrate the runoff capacity of flow from minor drainage to mayor drainage for anticipating a peak flow in a particular area. The most important result was when high rainfall intensity started in the first hour, it should be no obstacles until the flow from minor drainage flow through the outlet towards major drainage, in the four hours after rainfall, peak flow happens to flow through study area. In the analysis, it is known that the peak flood discharge period of 5-yr and 10-yr returns is one hour after the rainfall. Therefore this will not happen when the flow from the drainage outlet has a travel time of under one hour or after 3 hours after rainfall.