2018
DOI: 10.24815/jts.v1i4.10064
|View full text |Cite
|
Sign up to set email alerts
|

Penelusuran Banjir Pada Embung Lambadeuk Kabupaten Aceh Besar

Abstract: Lambadeuk Dam whose construction was completed in 2013. The main source of water from Lambadeuk Dam comes from a river channel located in the Lambadeuk mountain area which has a wide watershed of   ± 3,1 Km2, with the storage reservoir is ± 6 Ha. This study is intended to recalculate the flood discharge plan and re-analyze flood tracking. To calculate the duration of hour-time rain used Alternating Block Method that converts hourly rain. A procedure is needed to determine the flow time and flow at a point on a… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0
1

Year Published

2018
2018
2018
2018

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
0
0
1
Order By: Relevance
“…Kolam penampungan merupakan sebuah area penampung pada musim hujan, dan bisa dimanfaatkan pada saat kemarau. Terdapat dua jenis kolam penampungan, yaitu danau yang terbentuk secara alami dan embung (waduk) yang dibangun oleh manusia atas dasar berbagai kebutuhan (Radityo et al, 2018(Radityo et al, : 1028.…”
Section: A Pendahuluanunclassified
“…Kolam penampungan merupakan sebuah area penampung pada musim hujan, dan bisa dimanfaatkan pada saat kemarau. Terdapat dua jenis kolam penampungan, yaitu danau yang terbentuk secara alami dan embung (waduk) yang dibangun oleh manusia atas dasar berbagai kebutuhan (Radityo et al, 2018(Radityo et al, : 1028.…”
Section: A Pendahuluanunclassified