Penerapan Manajemen Resiko pada Pembangunan Proyek Perpanjangan Dermaga log (Studi Kasus: Pelabuhan DalamTanjung Emas Semarang)

Abstract: Delay in the implementation of the project often occurs due to various risk factors that have not been identified during project implementation, so that the impact on project delays and unexpected costs increases. However, each construction project has different risks, becaused the environmental conditions of the project, so that it requires handling different methods of project implementation. This study aims to: 1) analyze the risks that could potentially occur during the construction of the log dock extensi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0
1

Year Published

2020
2020
2023
2023

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(2 citation statements)
references
References 4 publications
0
1
0
1
Order By: Relevance
“…Beberapa penelitian sejenis yaitu Ismiyati et.al menganalisis risiko-risiko yang berpotensi terjadi pada masa konstruksi perpanjangan dermaga log dan metode penanganan yang tepat pada pelaksanaan Pekerjaan Perpanjangan Dermaga Log. Hasil penelitian fenomena eksternal yang tidak terprediksi, seperti elevasi pasang surut yang melebihi rencana sehingga berdampak pada perubahan desain dan metode pelaksanaan merupakan risiko berkategori tinggi berpengaruh terhadap keterlambatan proyek [1]. [4].…”
Section: Pendahuluanunclassified
“…Beberapa penelitian sejenis yaitu Ismiyati et.al menganalisis risiko-risiko yang berpotensi terjadi pada masa konstruksi perpanjangan dermaga log dan metode penanganan yang tepat pada pelaksanaan Pekerjaan Perpanjangan Dermaga Log. Hasil penelitian fenomena eksternal yang tidak terprediksi, seperti elevasi pasang surut yang melebihi rencana sehingga berdampak pada perubahan desain dan metode pelaksanaan merupakan risiko berkategori tinggi berpengaruh terhadap keterlambatan proyek [1]. [4].…”
Section: Pendahuluanunclassified
“…Time and it is possible that the time delay that occurs at this time can be even more significant. Therefore, it is necessary to conduct research that aims to identify the factors that cause the risk of time delays, analyze the most dominant factors that lead to the risk of time delays, and look for the necessary handling actions so that the risk of time delays that occur does not increase or can also be prevented resolved [6] [7].…”
Section: Introductionmentioning
confidence: 99%