Pengukuran Produktivitas Tenaga Kerja Pemasangan Plafon U-Baffle menggunakan Metode Time Study dan Productivity Rating
Aurora Anggun Sasmita,
Alma Fiara,
Agung Bhakti Utama
et al.
Abstract:This study aims to determine the productivity values and Labor Utilization Rate (LUR) of labor in the U-Baffle ceiling installation work. The research sample covers an area of 505 m2. Data normality is controlled using the Upper Control Limit (UCL) and Lower Control Limit (LCL). The results indicate that the productivity value for the installation of the hanging rod is 107.38 m2/day, stringer 138.21 m2/day, hollow (2.5 m) 125.41 m2/day, hollow (4m) 97.08 m2/day, and U-Baffle panel 525.71 m2/day. The coefficien… Show more
Set email alert for when this publication receives citations?
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.