2022
DOI: 10.15641/jcbm.5.2.1253
|View full text |Cite
|
Sign up to set email alerts
|

Performance Barriers in relation with Professional Development of Graduate Architects in Construction Industry: A Systematic Literature Review

Abstract: Graduate architects are first mate in architectural practice when handling building construction projects. They had been authorized to run projects in construction industry due to limited architects in the country. The capability of graduate architect when manage project is critical in reducing performance barriers encountered.  The aim of this paper is to identify the most critical performance barriers faced by graduate architects during project implementation. A systematic literature review of credible sourc… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 35 publications
0
0
0
Order By: Relevance
“…Zhao et al (2022) averred that variations were actual conditions rather than expected conditions contained in a contract. To Sanchez-Garrido et al (2022) and Haile (2022), variation can be defined as an alteration or modification of a design, quality of works, as shown in the contract drawings, bill of quantities (Tiew et al, 2022) and specifications and includes the addition, omission, or substitution of any works or (Alkhalifah et al, 2023) the modification of the original scope, execution time, or cost of work. Variation can also be a modification to contractual guidance provided to the contractor by the client or agents working on his behalf (Duguay et al, 2023;Smith et al, 2023;Alkhalifah et al, 2023).…”
Section: Introductionmentioning
confidence: 99%
“…Zhao et al (2022) averred that variations were actual conditions rather than expected conditions contained in a contract. To Sanchez-Garrido et al (2022) and Haile (2022), variation can be defined as an alteration or modification of a design, quality of works, as shown in the contract drawings, bill of quantities (Tiew et al, 2022) and specifications and includes the addition, omission, or substitution of any works or (Alkhalifah et al, 2023) the modification of the original scope, execution time, or cost of work. Variation can also be a modification to contractual guidance provided to the contractor by the client or agents working on his behalf (Duguay et al, 2023;Smith et al, 2023;Alkhalifah et al, 2023).…”
Section: Introductionmentioning
confidence: 99%