SPE/IADC Drilling Conference 1985
DOI: 10.2118/13474-ms
|View full text |Cite
|
Sign up to set email alerts
|

Performance Drilling Optimization

Abstract: The use of a newly-designed bottomhole assembly in the Kuparuk River Field on Alaska's North Slope has proven to be a cost-effective improvement over traditional rotary drilling methods. The bottomhole assembly consists of a polycrystalline diamond compact bit, a positive-displacement downhole motor with specially-designed tilted drive sub (called a navigation sub), and a measurement while drilling system. The use of these tools in combination allows the driller to constantly monitor the well pa… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0

Year Published

1992
1992
2023
2023

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 25 publications
(2 citation statements)
references
References 0 publications
0
1
0
Order By: Relevance
“…The calculation of the rate of build uses three point geometry. Figure 5 shows this information and the method for calculation of the angle build characteristics of the bent sub-motor assembly (Karlsson 1985). Surveys are run periodically to , determine azimuth coordinates and amount of deflection.…”
Section: Figure 3) Types Of Directionally Drilled Wellsmentioning
confidence: 99%
“…The calculation of the rate of build uses three point geometry. Figure 5 shows this information and the method for calculation of the angle build characteristics of the bent sub-motor assembly (Karlsson 1985). Surveys are run periodically to , determine azimuth coordinates and amount of deflection.…”
Section: Figure 3) Types Of Directionally Drilled Wellsmentioning
confidence: 99%
“…The key to successful anti-deviation drilling is the reasonable design of the drilling BHA structure according to the characteristics of the formation. For this reason, some theories have been proposed to evaluate the anti-deviation ability of the drilling BHA, including the three-point circle method [4,5], limiting curvature method [6], and balance trend method [7,8]. The three-point circle method estimates the build rate of the BHA based on geometric relationships.…”
Section: Introductionmentioning
confidence: 99%