2017
DOI: 10.1016/j.ress.2017.03.034
|View full text |Cite
|
Sign up to set email alerts
|

Performance evaluation of a two-machine line with a finite buffer and condition-based maintenance

Help me understand this report
View preprint versions

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
26
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 53 publications
(26 citation statements)
references
References 36 publications
0
26
0
Order By: Relevance
“…Existing research of condition-based maintenance of production systems largely sets a single threshold on the state of a machine. 911,13 This paper proposes the maintenance policies with two-threshold and four-threshold structures, which consider the stock level in adjacent buffers. This section compares the results of the maintenance optimisation using the three policy structures.…”
Section: Numerical Studymentioning
confidence: 99%
See 1 more Smart Citation
“…Existing research of condition-based maintenance of production systems largely sets a single threshold on the state of a machine. 911,13 This paper proposes the maintenance policies with two-threshold and four-threshold structures, which consider the stock level in adjacent buffers. This section compares the results of the maintenance optimisation using the three policy structures.…”
Section: Numerical Studymentioning
confidence: 99%
“…Tan and Gershwin 10 analysed the steady state of a production system with two machines and one buffer by solving differential equations, where the product flow in the system was assumed to be continuous. Fitouhi et al 11 used the Markov model to estimate the performance of a two-machine and one buffer flow line system, where both the minimal repair and condition-based maintenance were considered. Gebennini and Grassi 12 developed a discrete-time discrete-state Markov model for a production system with two machines and one buffer, where the buffer bypass and buffer depended production rates were considered.…”
Section: Introductionmentioning
confidence: 99%
“…Then a Lagrangian-based heuristic procedure for the solution is proposed and discussed, which includes both minimal repair and preventive maintenance. The problem of the optimal policy for Preventive Maintenance scheduling is analyzed in Ambani et al (2010), and more recently (Fitouhi et al 2017), investigates the impact of a Condition-based Maintenance policy on the performance evaluation of a two-machine line where machines are characterized by degrading behavior, by means of an analytical model. Moreover (de Jonge et al 2017), analyzes in which cases condition-based preventive maintenance is to be preferred to time-based preventive maintenance.…”
Section: Literature Reviewmentioning
confidence: 99%
“…24 Ribeiro et al used a mixed integer linear programming model to jointly optimize the maintenance policy and buffer size. 25 Fitouhi et al 26 proposed a maintenance model by analyzing the trade-off between preventive maintenance and buffer size. Cheng developed a maintenance model by using buffer size K and working age T as two decision variables.…”
Section: Introductionmentioning
confidence: 99%