Performance Investigation of Steam Boiler of PLTU Tello Makassar Using Energy – Exergy and Entropy Balance Approach

Abstract: This work aims to investigate the performance of the boiler of a power plant in Tello Makassar. The boiler has generated an electricity power of 50 MW in order to fulfil the electricity needed by people in Makassar city. Performance investigation of the steam generator is very important due to the operation of the boiler is a long time since 1971. The methodology in this study uses energy and exergy analysis as well as the entropy generation approach. The methodology will be applied in all the boiler component… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 16 publications
0
1
0
Order By: Relevance
“…The energy and exergy flow rate in this experiment will be the next research. It is required to make the process better in reducing the loss of energy, as the author has done in energy generation at PLTU Tello Makassar [45].…”
Section: Ii33mentioning
confidence: 99%
“…The energy and exergy flow rate in this experiment will be the next research. It is required to make the process better in reducing the loss of energy, as the author has done in energy generation at PLTU Tello Makassar [45].…”
Section: Ii33mentioning
confidence: 99%