2003
DOI: 10.1016/s0306-2619(02)00144-7
|View full text |Cite
|
Sign up to set email alerts
|

Performance of a grid connected small PV system in Poland

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

2
40
0
1

Year Published

2011
2011
2024
2024

Publication Types

Select...
7
3

Relationship

0
10

Authors

Journals

citations
Cited by 103 publications
(43 citation statements)
references
References 2 publications
2
40
0
1
Order By: Relevance
“…The performance ratio (PR) and capacity factor (CF) of the system were reported 84.6% and 21%, respectively. Pietruszko and Gradzki [17] have investigated monitoring data from a 1 kW grid-connected PV system for a period of one year in Poland. They have reported the annual energy yield was about 830 kW h and the performance ratio ranged from 60% to 80%.…”
Section: Introductionmentioning
confidence: 99%
“…The performance ratio (PR) and capacity factor (CF) of the system were reported 84.6% and 21%, respectively. Pietruszko and Gradzki [17] have investigated monitoring data from a 1 kW grid-connected PV system for a period of one year in Poland. They have reported the annual energy yield was about 830 kW h and the performance ratio ranged from 60% to 80%.…”
Section: Introductionmentioning
confidence: 99%
“…a b s t r a c t 24 This paper presents results obtained from monitoring a 1.72 kW p photovoltaic system installed on a flat 25 roof of a 12 m high building in Dublin, Ireland (latitude 53.4°N and longitude 6.3°E). The system was 26 monitored between November 2008 and October 2009 and all the electricity generated was fed into 27 the low voltage supply to the building.…”
mentioning
confidence: 99%
“…Performance ratio for the whole year was 0.79. For other PV installations the Performance ratio varies from 0.7 to 0.9 (Thailand) [13], from 0.38 to 0.88 (Germany) [14], and from 0.5 to 0.8 (Poland) [15]. Comparison of various PR for different PV installation were shown in Fig 3. For the most of selected installations performance ratios were above 0.7.…”
Section: Resultsmentioning
confidence: 98%