Based on an example of a gas-fired boiler for an industrial user in Tianjin, the absorption heat pump technology was used to carry out energy-saving transformation of the above boiler. The actual test was carried out on the gas flow, exhaust gas temperature and other parameters from January 2, 2018 to February 26, 2018. And then, the thermal efficiency of the boiler was analysed. The results show that after the energy-saving transformation, the exhaust gas temperature of the gas-fired boiler can be reduced from 140 °C to about 40 °C, and the overall thermal efficiency of the boiler also rises from 89.5% to 101.3%, which is 13.2% higher than that before optimization. According to the economic analysis, the energy-saving reconstruction project can achieve an energy-saving economic benefit of 1.598 million yuan throughout the year, with obvious energy-saving and emission reduction benefits.