2018
DOI: 10.1016/j.isatra.2018.07.024
|View full text |Cite
|
Sign up to set email alerts
|

Performance optimization of linear active disturbance rejection control approach by modified bat inspired algorithm for single area load frequency control concerning high wind power penetration

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
20
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 35 publications
(20 citation statements)
references
References 31 publications
0
20
0
Order By: Relevance
“…For this reason, wind speed is one of the important parameters for designing a wind turbine system. The output power of wind turbine system is calculated from equation ( 2) to (4) [12,13].…”
Section: Wind Turbine Systemmentioning
confidence: 99%
“…For this reason, wind speed is one of the important parameters for designing a wind turbine system. The output power of wind turbine system is calculated from equation ( 2) to (4) [12,13].…”
Section: Wind Turbine Systemmentioning
confidence: 99%
“…Notably, in PSs, the load disturbances such as variations in generation and oscillations in power angel will disrupt the systems outcome. Therefore, the issue of disturbances has been a prime issue in control design [33][34][35][36]. Recently, the linear active disturbance rejection strategy is developed in Ali et al [36] by formulating extended state observer to estimate the unpredictable disturbances and unmodeled parameters of a single area wind PSs and which are compensated by making use of PD control law.…”
Section: Introductionmentioning
confidence: 99%
“…Large penetration DFIG‐based wind turbine is an important issue in front of the electric power systems. It means that, DFIG must participate in the system frequency regulation and active power generation during any operating condition 13–15 . Therefore, some frequency regulators based on inertial response and frequency control have been extensively used, 16,17 which are scheduled by creating a relationship between the network frequency and active power of DFIG to support them during the disturbance conditions.…”
Section: Introductionmentioning
confidence: 99%