“…There are various methods and technological schemes for the construction of vertical shafts [1,2], differing in the equipment of the surface for sinking, the technologies and equipment used for destruction, loading and transportation of rocks, the design of temporary and permanent lining, the sequence of the main and auxiliary technological processes. When choosing a method, technological scheme of drilling, structure of support and reinforcement of a vertical shaft, a large number of factors are taken into account, the main of which are the shaft depth and diameter, mining and geological and hydrogeological conditions of drilling, as well as the whole range of permanent, temporary and special loads, including technological and operational, and their most unfavorable combinations [2].…”