Proceedings of the 17th ACM Great Lakes Symposium on VLSI 2007
DOI: 10.1145/1228784.1228896
|View full text |Cite
|
Sign up to set email alerts
|

Physical aware clock skew rescheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2008
2008
2015
2015

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(5 citation statements)
references
References 10 publications
0
5
0
Order By: Relevance
“…In order to illustrate the efficiency of the proposed algorithm, we compared it with a linear programming (LP) solver for the clock period and timing slack optimization problem (13) in Section 5.1. Then we compared it with a convex programming (CP) solver for the clock period and yield-driven optimization problem (20) in Section 5.2.…”
Section: Resultsmentioning
confidence: 99%
See 2 more Smart Citations
“…In order to illustrate the efficiency of the proposed algorithm, we compared it with a linear programming (LP) solver for the clock period and timing slack optimization problem (13) in Section 5.1. Then we compared it with a convex programming (CP) solver for the clock period and yield-driven optimization problem (20) in Section 5.2.…”
Section: Resultsmentioning
confidence: 99%
“…The clock period and timing slack optimization problem is formulated in Problem (13). The weight of slack w s was assigned as 5.…”
Section: Clock Period and Timing Slack Optimization Experimental Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…M. Saitoh et al [6] even modified previous clock schedule to have more registers with the similar required clock latency in a close area. Wei et al [7] found nearby points by Delaunay triangle in Voronoi diagram, and turned physical relations into limited constraints called geometry skew constraints during yield-oriented clock skew scheduling.…”
Section: Related Workmentioning
confidence: 99%
“…In the literature, there are two ways to follow: physical location-aware clock skew scheduling [4,5,7] and clock skew scheduling-aware placement [8].…”
Section: Introductionmentioning
confidence: 99%