All Days 2011
DOI: 10.2118/149716-ms
|View full text |Cite
|
Sign up to set email alerts
|

Piltun Field PLT Results in Commingled-Reservoir Wells Drive Smart-Well Implementation & Field Redevelopment

Abstract: The subsurface development and well intervention teams recently completed a campaign of five production logs (PLTs) in the extended reach and highly deviated production wells of the Piltun field. The challenges of running the PLT logs were considerable: 4,000 to 7,000 m long deviated wells, complex well trajectories, long tractoring intervals, risk of tool lift due to high oil and gas rates, high wellhead pressures of ~2000 psi, harsh winter conditions, the problem of hydrate formation on the wire and in the p… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2016
2016
2016
2016

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 0 publications
0
0
0
Order By: Relevance