SPE/IADC Drilling Conference 2001
DOI: 10.2118/67689-ms
|View full text |Cite
|
Sign up to set email alerts
|

Planning and Implementation of the Repsol-YPF-MAXUS Krisna Underbalanced Drilling Project

Abstract: Due to the previous history of high mud losses and stuck pipe, Repsol - YPF - MAXUS Southeast Sumatra B. V. decided to implement underbalanced drilling technology in the development drilling campaign in the Krisna Field offshore Indonesia. Although Underbalanced drilling is not a new technology, it has been used infrequently in drilling from an offshore structure. Underbalanced drilling from a jack-up rig causes some unique planning and implementation issues. Planning and implementation are m… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2002
2002
2010
2010

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Field applications have proven that UBD techniques have many advantages including minimized formation damage, increased drilling rate, improved formation evaluation while drilling, minimized lost circulation, reduced occurrence of differential pipe and logging tools sticking, enhanced detection of all producing zones, and enhanced earlier production from reservoir [3][4][5][6][7][8][9][10][11].…”
Section: Introductionmentioning
confidence: 99%
“…Field applications have proven that UBD techniques have many advantages including minimized formation damage, increased drilling rate, improved formation evaluation while drilling, minimized lost circulation, reduced occurrence of differential pipe and logging tools sticking, enhanced detection of all producing zones, and enhanced earlier production from reservoir [3][4][5][6][7][8][9][10][11].…”
Section: Introductionmentioning
confidence: 99%