Planning for distributed wind generation under active management mode

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
31
0

Year Published

2015
2015
2021
2021

Publication Types

Select...
6
1

Relationship

1
6

Authors

Journals

citations
Cited by 48 publications
(31 citation statements)
references
References 25 publications
0
31
0
Order By: Relevance
“…Economic objectives ·Minimization of investment and operation costs [23], [24], [25], [26], [30], [31], [38], [42], [46]... ·Minimization of network losses [34], [40], [41], [56], [63], [73], [84], [91], [102]... ·Maximization of net profit value [33], [44], [72], [81], [84], [92], [97], [103]...…”
Section: Objectives Of Ads Planning Modelmentioning
confidence: 99%
See 2 more Smart Citations
“…Economic objectives ·Minimization of investment and operation costs [23], [24], [25], [26], [30], [31], [38], [42], [46]... ·Minimization of network losses [34], [40], [41], [56], [63], [73], [84], [91], [102]... ·Maximization of net profit value [33], [44], [72], [81], [84], [92], [97], [103]...…”
Section: Objectives Of Ads Planning Modelmentioning
confidence: 99%
“…The process is shown in Figure 9. Then, combined with the approaches of probabilistic optimal power flow [44,60,79], chance constrained programming [62,70], etc., these simulated data of RDGs and load demand could be used in ADS planning models considering high-level uncertainties.…”
Section: Probabilistic Approachesmentioning
confidence: 99%
See 1 more Smart Citation
“…ANM can be a solution to these operational problems. ANM is a smart-grid technology that enables a MGO to measure the state of each bus, such as the voltage and angle, in real-time; calculate the optimal dispatch of resources considering the network conditions and physical constraints; and then deliver the dispatched signals to resources through a communication infrastructure [12][13][14][15]. Therefore, a MGO with ANM is able to stably and efficiently operate a renewable MG by optimally curtailing the outputs of RDGs and loads and scheduling the active/reactive powers of BESSs without violating physical constraints.…”
Section: Features Of Active Network Management In Microgrid Operationmentioning
confidence: 99%
“…The above real-time adjustments of the MGO can be realized through Active Network Management (ANM) [12][13][14][15]. Owing to the real-time adjustments using ANM, the power flow in the line connecting the main grid and MG can deviate significantly from the submitted bid, which is obtained according to the bidding strategies proposed in [10,11].…”
Section: Introductionmentioning
confidence: 99%