Planning in Construction: Longitudinal Study of Pre-Contract Planning Model Demonstrates Reduction in Project Cost and Schedule Growth

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
9
0

Year Published

2015
2015
2021
2021

Publication Types

Select...
5
1
1

Relationship

1
6

Authors

Journals

citations
Cited by 13 publications
(9 citation statements)
references
References 31 publications
0
9
0
Order By: Relevance
“…One major area is alternative procurement methods, which include different evaluation practices aimed at minimizing the owner's risk of procuring low-performing AEC firms (Chan and Kumaraswamy, 1997;Iyer and Jha, 2005;Wardani et al, 2006). Innovative approaches to risk transfer are another major area, where unconventional contracting methods are intended to improve the identification, mitigation, and transfer of potential project risk factors (Lines et al, 2014a;Witt and Liias, 2011). Third, new project management processes are intended to enhance project control such that owner organizations are better able to measure project performance and increase accountability of hired AEC firms to deliver expected levels of quality (Perrenoud et al, 2013;Rahman and Kumaraswamy, 2004).…”
Section: Introductionmentioning
confidence: 99%
“…One major area is alternative procurement methods, which include different evaluation practices aimed at minimizing the owner's risk of procuring low-performing AEC firms (Chan and Kumaraswamy, 1997;Iyer and Jha, 2005;Wardani et al, 2006). Innovative approaches to risk transfer are another major area, where unconventional contracting methods are intended to improve the identification, mitigation, and transfer of potential project risk factors (Lines et al, 2014a;Witt and Liias, 2011). Third, new project management processes are intended to enhance project control such that owner organizations are better able to measure project performance and increase accountability of hired AEC firms to deliver expected levels of quality (Perrenoud et al, 2013;Rahman and Kumaraswamy, 2004).…”
Section: Introductionmentioning
confidence: 99%
“…According to The KPI Team [29], the KPI related to environment was viewed in two aspects, product performance vs. construction process performance. Project planning is the process of deciding what and how to do before action is required [30], and is a continuous process that spans throughout the delivery of a project [31]. Measures such as 'planning efficiency' and 'planning effectiveness' are often used to assess the level of planning performance.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Organization's management practices determine how the projects are properly planned within an acceptable schedule practice. Lines et al (2015) developed precontract model which was implemented between contractor and client prior to the contract award. The model showed that pre-contract planning reduced project cost by 54% and improved CPS by 70% with increased client satisfaction.…”
Section: Planning and Controlling Schedulementioning
confidence: 99%
“…AlNasseri and Aulin (2015) indicated that an incorporation of detailed project scope during front-end planning significantly contributes for project success. For instance, Lines et al (2015) has examined that project duration could be shorten by 54% and minimized cost by 70% if pre-contract planning is incorporated. However, front end planning effort is given less attention during the initial project schedule (AlNasseri & Aulin, 2015;Zwikael, 2009).…”
Section: Front-end Schedule Reliability Assessmentmentioning
confidence: 99%
See 1 more Smart Citation