Abstract: This paper deals with the model predictive control (MPC) of an industrial hybrid process where continuous and batch units operate jointly: the crystallization section of a sugar factory. The paper describes a plantwide predictive controller that takes into account, both, continuous objectives and manipulated variables, as well as those related to the discrete operation and logic of the batch units. The MPC is formulated with time events, so that a more efficient NLP optimization technique, instead of MINLP, co… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
18
0

Year Published

2007
2007
2019
2019

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 17 publications
(18 citation statements)
references
References 13 publications
0
18
0
Order By: Relevance
“…The scheduling problem would suggest the need to solve, at each iteration of the coordinator, a mixed-integer nonlinear problem (MINLP) that could be very demanding in the computational sense. In this particular case, this could be avoided by means of the parametrization described in the work of de Prada et al, 39 where the Load i binary command for starting subordinate cycles is replaced by the continuous time T loadi to wait from the considered time to the instant of batch initiation as shown in Figure 2B.…”
Section: Hierarchically Coordinated Optimization: Solution By Means Omentioning
confidence: 99%
See 3 more Smart Citations
“…The scheduling problem would suggest the need to solve, at each iteration of the coordinator, a mixed-integer nonlinear problem (MINLP) that could be very demanding in the computational sense. In this particular case, this could be avoided by means of the parametrization described in the work of de Prada et al, 39 where the Load i binary command for starting subordinate cycles is replaced by the continuous time T loadi to wait from the considered time to the instant of batch initiation as shown in Figure 2B.…”
Section: Hierarchically Coordinated Optimization: Solution By Means Omentioning
confidence: 99%
“…The optimization problem of the coordinator, as applied to the particular case at hand, is represented by Equations (30)(31)(32)(33)(34)(35)(36)(37)(38)(39). The performance function is considered to be the aggregate value of the consumption of steam by all the crystallizers in the whole exercise.…”
Section: Sugar Case Study Two-level Coordinated Plantwide Optimizationmentioning
confidence: 99%
See 2 more Smart Citations
“…de Prada et al [2] describe an adaptive hybrid predictive control strategy for the crystallization section of a sugar factory where continuous and batch units operate jointly. A more efficient NLP optimization technique is proposed, instead of MINLP, and is applied to an industrial sugar factory simulator.…”
mentioning
confidence: 99%