2022
DOI: 10.30855/gmbd.2022.01.10
|View full text |Cite
|
Sign up to set email alerts
|

Pompaj Depolamalı Hidroelektrik Santrallerinin Varlığında Birim Taahhüt Probleminin İncelenmesi: Kahramanmaraş Örneği

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…This project, which will be the first pumped-storage system in Türkiye, is to be carried out by the Joint Venture formed by two Japanese companies and one Turkish company. Aside from this tangible action for realization of a first pumped-storage hydropower system, there have been quite a few academic theses, technical reports, and papers about pumped-storage hydropower in Türkiye [6,7,8,9,10,11,12,13,14,15,16].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…This project, which will be the first pumped-storage system in Türkiye, is to be carried out by the Joint Venture formed by two Japanese companies and one Turkish company. Aside from this tangible action for realization of a first pumped-storage hydropower system, there have been quite a few academic theses, technical reports, and papers about pumped-storage hydropower in Türkiye [6,7,8,9,10,11,12,13,14,15,16].…”
Section: Introductionmentioning
confidence: 99%
“…Yet, the costs of either a reversible turbine-pump system or of a separate turbine-generator and motor-pump system are greater than that of a conventional turbine-generator unit. Therefore, it is obvious that in order for a pumped-storage hydropower project to be feasible, the market unit price of the hydroelectric energy generated during the peak-demand period should be considerably higher than that of the low-demand time, the so-called energy arbitrage as pointed out by both Zhang et al [2] and Firis et al [13]. The price differences in parallel with the grid demands may also affect the overall financial benefit of even the conventional HPPs.…”
Section: Introductionmentioning
confidence: 99%