1977
DOI: 10.1109/tns.1977.4328890
|View full text |Cite
|
Sign up to set email alerts
|

POPAE - A 1000 Gev on 1000 Gev Proton-Proton Colliding Beam Facility

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

1983
1983
2020
2020

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 5 publications
0
1
0
Order By: Relevance
“…A signal-event-functional-interrupt (SEFI) is observed when the ADC output gets stuck at a given value, and a reset is needed to return to normal operation (but not a power cycling of the device). The dependence of the SEE rate with the LET of the heavy ion can be parameterized with a Weibull function [10]:…”
Section: Radiation Tolerancementioning
confidence: 99%
“…A signal-event-functional-interrupt (SEFI) is observed when the ADC output gets stuck at a given value, and a reset is needed to return to normal operation (but not a power cycling of the device). The dependence of the SEE rate with the LET of the heavy ion can be parameterized with a Weibull function [10]:…”
Section: Radiation Tolerancementioning
confidence: 99%