Abstract: Development and design of low power mobile and inexpensive solar stations are important for farmers, individuals, geologists and trotters. The most important aspect is ensuring reliability of units in times of transportation, convenience and operational ease as well as minimum dimensions, low price. All the above will ensure large-scale implementation of solar stations in various applications and utilizations.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
34
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 37 publications
(34 citation statements)
references
References 3 publications
0
34
0
Order By: Relevance
“…Calculation of the PES output power. When designing an Autonomous solar power plant, you first need to make a list of all electricity consumers, find out their power consumption, voltage and enter it in the list ( with voltage values that differ from the nominal value of the main bus voltage -via DC pulse converters of both increasing and decreasing types [13][14][15][16]. The consumer (№.…”
Section: Theoretical Analysismentioning
confidence: 99%
“…Calculation of the PES output power. When designing an Autonomous solar power plant, you first need to make a list of all electricity consumers, find out their power consumption, voltage and enter it in the list ( with voltage values that differ from the nominal value of the main bus voltage -via DC pulse converters of both increasing and decreasing types [13][14][15][16]. The consumer (№.…”
Section: Theoretical Analysismentioning
confidence: 99%
“…Previous studies show that the introduction of asynchronous turbine generators (ATG) into the composition of electric power systems leads to an increase in their static and dynamic stability under steady-state and transient conditions [10][11][12][13].…”
Section: Main Partmentioning
confidence: 99%
“…Cross-border, interstate tariffs for the sale of electricity are set at the level of governments involved in international projects in the field of electricity. The tariff can be set through negotiations, but as a rule, it always equals or exceeds the transmission tariff on internal lines; it is also determined by the nature of the organization supplying and / or receiving electricity [16][17][18][19][20][21][22][23].…”
Section: Half-wave Circuitmentioning
confidence: 99%
“…In the Unified Energy System of Central Asia and other CIS networks, special fees are charged for frequency regulation, for unscheduled flows of electricity from one country to another, caused, for example, by an unexpected sharp increase in demand in a neighboring country. This issue is usually resolved separately with the help of one of the network operators [24][25][26][27].…”