2018
DOI: 10.11591/ijeecs.v12.i1.pp399-405
|View full text |Cite
|
Sign up to set email alerts
|

Power Cable with Two Joints Experimental Analysis for Defect Assessments

Abstract: <span>Time domain reflectometry (TDR) is an easy technique that provides quick response which is ideal for power utility companies to conduct cable diagnostics on-site. Electricity disruption due to power cable failure is a major challenge for power utility companies due to the long length of cable installed with joints. The long time taken to diagnose the defect along the cable before electricity can be restored has not only jeopardized the reputation of power utility companies but also brings losses to… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 9 publications
0
0
0
Order By: Relevance