1996
DOI: 10.1142/p010
|View full text |Cite
|
Sign up to set email alerts
|

Practical Railway Engineering

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
21
0
5

Year Published

2009
2009
2016
2016

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 24 publications
(26 citation statements)
references
References 0 publications
0
21
0
5
Order By: Relevance
“…ƒ coefficient calculates horizontal lateral (cross to central line of track) wheel forces and twisting moments on rail. This coefficient is estimated on the basis of experimental surveys on different types of rolling stock and theoretical calculations of railroad durability [4][5][6][7][8][9][10].…”
Section: The Determination Of the Coefficient Which Includes Horizontmentioning
confidence: 99%
See 1 more Smart Citation
“…ƒ coefficient calculates horizontal lateral (cross to central line of track) wheel forces and twisting moments on rail. This coefficient is estimated on the basis of experimental surveys on different types of rolling stock and theoretical calculations of railroad durability [4][5][6][7][8][9][10].…”
Section: The Determination Of the Coefficient Which Includes Horizontmentioning
confidence: 99%
“…In order to estimate stress state of railways the calculations for railways durability according to the methods given in [3][4][5][6][7][8][9][10][11][12] were made. On the basis of made calculations and results of dynamic and railroad tests, the admissible speed of locomotives for typical railways construction on straight and curved track sections were determined.…”
Section: Introductionmentioning
confidence: 99%
“…Bonnet [3] indicated the seriousness of ballast degradation upon the maintenance of line, level and riding comfort. He also recommended the development of intervention led replacement rather than repair after failure.…”
Section: Principles Of Extending Track Lifementioning
confidence: 99%
“…Further, it is commonly noted that earthwork failure is rarely sudden and without warning (for example (Bonnett 2005) section 6.5, p85), and simple monitoring techniques are available to give early warning, the most obvious one being tell-tales, which consist of a number of pegs set out in a straight line. Any siginificant movement of the earthwork would result in pegs moving out of line, which would be readily observable even by an unqualified staff member.…”
Section: Monitoring and Remediationmentioning
confidence: 99%