“…Thus, while some similarities exist between these events, we have concluded the underlying casual factors of these events are different. FACILITY NAME (1) DOCKET NUMBER (2) LER NUMBER (6) PAGE ( On May 21, 1994, at 1442 hours, the dispatcher notified the BNP Control Room that they were commencing the switching evolution to return the Whiteville 230 kV line to service. At 1505 hours, the dispatcher confirmed with the BNP Unit 2 Control Room that the SAT was being supplied from Switchyard Bus 2B.…”