2005
DOI: 10.1007/s10111-004-0167-x
|View full text |Cite
|
Sign up to set email alerts
|

Predicting nuclear power-plant operator performance using discrete event simulation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
3
0
1

Year Published

2008
2008
2024
2024

Publication Types

Select...
6
3

Relationship

1
8

Authors

Journals

citations
Cited by 13 publications
(5 citation statements)
references
References 4 publications
1
3
0
1
Order By: Relevance
“…Nonetheless, the data was found to be valuable and provided us a means to estimate the model's error. Lastly, this work illustrated how validation can be approached under the typical real world constraints and is in line with other DES model validation work (Yow, Walters, Plott, Laughery, & Persensky, 2005). We have also supported the idea that iterative design in which modeling and HITL testing are used in each design cycle will enable a much better design because many design factors can be considered that one of the two methods alone cannot.…”
Section: Resultssupporting
confidence: 71%
“…Nonetheless, the data was found to be valuable and provided us a means to estimate the model's error. Lastly, this work illustrated how validation can be approached under the typical real world constraints and is in line with other DES model validation work (Yow, Walters, Plott, Laughery, & Persensky, 2005). We have also supported the idea that iterative design in which modeling and HITL testing are used in each design cycle will enable a much better design because many design factors can be considered that one of the two methods alone cannot.…”
Section: Resultssupporting
confidence: 71%
“…生産現場では, 専門知識・技術をもった各作業者がチームとなって取り組む業務が多くの割合を占めている (1) . チーム作業分析に関する研究は多々行われている (2)(3) が,チーム作業分析に必要なデータの取得が非常に困難な ことが問題点として挙げられる (4) .この問題点を解決するために,人間に関する様々なものを計測するセンサが 開発され,センサから得られる情報をもとに行動分析を行う研究例が存在する (5)…”
Section: 緒 言unclassified
“…In another study, Yow et al, (2005) compared HPM predictions of the crew's response to plant disturbances to that of actual crews responding to them in a plant simulator. The performance measures were task times and workload.…”
Section: Use Of Hpms In the Nuclear Industrymentioning
confidence: 99%