2016
DOI: 10.1007/s11740-016-0709-0
|View full text |Cite
|
Sign up to set email alerts
|

Predicting the potential of production structure changes using characteristic curves

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 17 publications
0
1
0
Order By: Relevance
“…This requires a lot of time and assumes that the planning team has a high level of planning skills [7]. Due to the lack of an objective evaluation approach, there is also the risk that layout variants are selected which do not represent an optimal alternative with regard to the overall objectives [8].…”
Section: Introductionmentioning
confidence: 99%
“…This requires a lot of time and assumes that the planning team has a high level of planning skills [7]. Due to the lack of an objective evaluation approach, there is also the risk that layout variants are selected which do not represent an optimal alternative with regard to the overall objectives [8].…”
Section: Introductionmentioning
confidence: 99%