2022
DOI: 10.2478/amns.2022.2.0140
|View full text |Cite
|
Sign up to set email alerts
|

Prediction of corporate financial distress based on digital signal processing and multiple regression analysis

Abstract: In order to reduce the default rate of corporate bond market, the author proposes to use digital signal processing and multiple regression analysis to study the prediction system of financial distressed companies. First, design the research method, Logistic regression model is the most commonly used multivariate statistical method when modeling binary dependent variables, it can solve the problem of nonlinear classification, it has no specific requirements for the distribution of variables, and the accuracy of… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 12 publications
0
3
0
Order By: Relevance
“…To use the optimization model on a network or hybrid system, intelligent devices are needed [95][96][97][98]. The core of smart systems is telecommunications equipment [99][100][101][102][103]. These systems coordinate the different power components [104][105][106][107][108].…”
Section:  mentioning
confidence: 99%
“…To use the optimization model on a network or hybrid system, intelligent devices are needed [95][96][97][98]. The core of smart systems is telecommunications equipment [99][100][101][102][103]. These systems coordinate the different power components [104][105][106][107][108].…”
Section:  mentioning
confidence: 99%
“…Optimization formulation is as non-linear, linear, mixed integer non-linear or mixed integer linear models [88][89][90][91]. In order to implement the optimization model on a network, it is necessary to have intelligent devices [92][93][94][95][96][97][98]. Smart systems are based on telecommunications equipment [99][100].…”
Section: Vpp Constraintsmentioning
confidence: 99%
“…In order to implement the optimization model on a network, it is necessary to have intelligent devices [92][93][94][95][96]. Smart systems are based on telecommunications equipment [97][98][99][100][101]. These systems use to coordinate of the different power elements [102][103][104][105][106][107].…”
Section: Formulation Of the Ibvpp Operationmentioning
confidence: 99%