Prediction of specific electric energy consumption at processing plant

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…-short circuit on the buses of workshop substations. At the same time, the power supply interruption time is the sum of the short circuit disconnection time on the supply line and the ASR operation time at the substation [4][5][6][7][8][9];…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…-short circuit on the buses of workshop substations. At the same time, the power supply interruption time is the sum of the short circuit disconnection time on the supply line and the ASR operation time at the substation [4][5][6][7][8][9];…”
Section: Methodsmentioning
confidence: 99%
“…Two sections of substation No. 12 are powered by 5 motors with a capacity of 320 kW, one motor with a capacity of 400 kW [4][5][6]. Communication between substations No.…”
Section: Brief Description Of the Power Supply Circuit For Motors With A Voltage Of 6 Kvmentioning
confidence: 99%
“…Thus, the juice concentration unit will perform two tasks at the same time: concentrating itself and working as an additional refrigeration unit for cooling process liquids [8][9][10].…”
Section: Description Of the Vacuum Concentration Unitmentioning
confidence: 99%