2020
DOI: 10.1016/j.enggeo.2020.105709
|View full text |Cite
|
Sign up to set email alerts
|

Prediction of the overtopping-induced breach process of the landslide dam

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
19
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 35 publications
(19 citation statements)
references
References 25 publications
0
19
0
Order By: Relevance
“…Once the landslide dam forms, emergency response normally requires rapid prediction of the breach flow discharge and breach size evolution (Chen et al, 2020). A numerical method that rapidly predicts the dam breach process is proposed based on the model of Zhong et al (2020a).…”
Section: Methodsmentioning
confidence: 99%
See 4 more Smart Citations
“…Once the landslide dam forms, emergency response normally requires rapid prediction of the breach flow discharge and breach size evolution (Chen et al, 2020). A numerical method that rapidly predicts the dam breach process is proposed based on the model of Zhong et al (2020a).…”
Section: Methodsmentioning
confidence: 99%
“…Where k sm is the correction coefficient of tail water (Fread, 1984), m is the ratio of breach slope (horizontal/vertical); c 1 and c 2 are the correction coefficients. Here, c 1 = 1.7 m 0.5 /s, c 2 = 1.1 m 0.5 /s (Zhong et al, 2020a). b is the breach bottom width, z b is the breach bottom elevation and H = z s -z b is the breach water depth.…”
Section: Methodsmentioning
confidence: 99%
See 3 more Smart Citations