2020
DOI: 10.1088/1757-899x/883/1/012008
|View full text |Cite
|
Sign up to set email alerts
|

Predictive Calculations of the Bulk Water Reservoir Capacity Using a Geographic Information System

Abstract: The Tuyamuyun hydro-complex on the Amu Darya River, consisting of one in-channel and three off-channel basins with a design volume of 7.8 billion m3, was intended to improve the supply of irrigation water and electricity to the Khorezm region and the Republic of Karakalpakstan and to control the catastrophic floods in the lower reaches; it was put into operation in 1984. The water reservoir complex is in joint use by the Republics of Uzbekistan and Turkmenistan. Numerous measurements showed that the useful vol… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 4 publications
0
2
0
Order By: Relevance
“…According to calculations, the total length of the settling basin will be 41 m, width 13 m, of which the length of the first chamber will be 25 m, depth 2.0 m, and the length of the second chamber will be 16 m, depth 1.7 m. According to the above recommendations, the volume of water in one-time filled sumps (cooling pools) reaches 3-5 hectares, and the irrigation norm for irrigating 20 hectares of land is 6 times. Therefore, it is important to develop recommendations to substantiate the optimal parameters of drip irrigation systems in farms receiving water from the Amudarya basin [5,6,[11][12][13][14][15].…”
Section: Introductionmentioning
confidence: 99%
“…According to calculations, the total length of the settling basin will be 41 m, width 13 m, of which the length of the first chamber will be 25 m, depth 2.0 m, and the length of the second chamber will be 16 m, depth 1.7 m. According to the above recommendations, the volume of water in one-time filled sumps (cooling pools) reaches 3-5 hectares, and the irrigation norm for irrigating 20 hectares of land is 6 times. Therefore, it is important to develop recommendations to substantiate the optimal parameters of drip irrigation systems in farms receiving water from the Amudarya basin [5,6,[11][12][13][14][15].…”
Section: Introductionmentioning
confidence: 99%
“…Tuyamuyun hydroelectric complex, which carries a large amount of suspended sediment with turbidity up to 12 kg/m 3 is the first on the list [8][9][10][11][12]. At present, out of 2.34 billion m 3 of the volume of Channel water reservoir, only 770 mln.m 3 is left, i.e.…”
Section: Introductionmentioning
confidence: 99%