2021
DOI: 10.1016/j.enbuild.2020.110487
|View full text |Cite
|
Sign up to set email alerts
|

Predictive maintenance scheduling optimization of building heating, ventilation, and air conditioning systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 23 publications
(7 citation statements)
references
References 22 publications
0
7
0
Order By: Relevance
“…Various smart energy systems have been reviewed and compared by Xu et al [47]. The planning of HVAC upgrades should also be optimized to maximize the systems' energy efficiency [48].…”
Section: Mechanical Ventilationmentioning
confidence: 99%
“…Various smart energy systems have been reviewed and compared by Xu et al [47]. The planning of HVAC upgrades should also be optimized to maximize the systems' energy efficiency [48].…”
Section: Mechanical Ventilationmentioning
confidence: 99%
“…Pistikopoulos et al 5 address integrated production and maintenance planning using a nondecreasing piecewise constant function to model degradation. Similar approaches have been applied to heat exchanger networks, 6 biopharmaceutical manufacturing processes, 7 compressor networks, 8 building HVAC systems, 9 and so forth. Depending on the application, maintenance needs to be considered at various time scales.…”
Section: Introductionmentioning
confidence: 99%
“…Although these problems are traceable to the extended response time of the biomass boilers when compared to the gas or coal fired boilers. Thus, some of the causes of the shutdown could be inadequate design of the hardware, installation and the overlay reactive control [45][46][47]. In the same vein, fouling is another challenge associated with the boiler.…”
Section: Condition Monitoring and Reliability Assessment Of Boilermentioning
confidence: 99%