2009
DOI: 10.5006/1.3319138
|View full text |Cite
|
Sign up to set email alerts
|

Predictive Model for Pitting Corrosion in Buried Oil and Gas Pipelines

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

3
86
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 172 publications
(89 citation statements)
references
References 5 publications
3
86
0
Order By: Relevance
“…For a given L/D and L/√Dt (Figures 9 and 10 It is evident from the information in Figure 8 that the burst pressure retention ratio (R r ) of the pipes reduced with the increase in d/t, which is similar to the findings of other researchers [5][6][7][8][9]. This scenario was necessitated by the increasing corrosion defect depth, which generally results in increased stress concentration on pipelines [18][19][20]. For a given L/D and L/ √ Dt (Figures 9 and 10), the retention ratios were fairly steady at each d/t as the L/D and L/ √ Dt values increased.…”
Section: Variability Of the Retained Strength Of The Corroded Pipelinessupporting
confidence: 79%
See 1 more Smart Citation
“…For a given L/D and L/√Dt (Figures 9 and 10 It is evident from the information in Figure 8 that the burst pressure retention ratio (R r ) of the pipes reduced with the increase in d/t, which is similar to the findings of other researchers [5][6][7][8][9]. This scenario was necessitated by the increasing corrosion defect depth, which generally results in increased stress concentration on pipelines [18][19][20]. For a given L/D and L/ √ Dt (Figures 9 and 10), the retention ratios were fairly steady at each d/t as the L/D and L/ √ Dt values increased.…”
Section: Variability Of the Retained Strength Of The Corroded Pipelinessupporting
confidence: 79%
“…It is evident from the information in Figure 8 that the burst pressure retention ratio (Rr) of the pipes reduced with the increase in d/t, which is similar to the findings of other researchers [5][6][7][8][9]. This scenario was necessitated by the increasing corrosion defect depth, which generally results in increased stress concentration on pipelines [18][19][20]. For a given L/D and L/√Dt (Figures 9 and 10 It is evident from the information in Figure 8 that the burst pressure retention ratio (R r ) of the pipes reduced with the increase in d/t, which is similar to the findings of other researchers [5][6][7][8][9].…”
Section: Variability Of the Retained Strength Of The Corroded Pipelinessupporting
confidence: 76%
“…There has not been another investigation as exhaustive as Romanoff's that can replace the data obtained in his study. He did investigate a second small set of samples to complete the previous cases [116]. These experiments were much shorter than those conducted by NIST, generally limited to a maximum of three years.…”
mentioning
confidence: 99%
“…The time of pitting initiation on the pipeline depends on the physical and chemical characteristics of the environment exposed to the pipeline [10,30] and the corrosion resistance ability of the pipeline material. The rate of change of deterministic pit depth (∆ ( ) ) can be expressed in terms of the deterministic intensity (λd) and change in time interval as follows:…”
Section: Figure 2: Graphical Representation Of Chapman-kolmogorov Equmentioning
confidence: 99%
“…Again, another work on experimental determination of internal pitting rate in pipelines concluded that increases in pitting rate occurs due to increased chloride concentration, temperature, subcutaneous substances (such as sand) and flow rate whereas decrease in pitting rate was observed with increase in bicarbonate, CO2 and H2S partial pressures and operating pressure [4], however, the results in this research were validated with limited field data. Pitting corrosion rate has also been modelled by researchers using damage function analysis by considering pit nucleation, growth rate and repassivation of carbon steel in chloride solution [22].The pitting rate for underground pipelines was also predicted with lognormal linear model in consideration of environmental variables [29] and the time of initiation of pitting has also been predicted for different soil categories using Monte Carlo simulation of field observed soil conditions [10].…”
Section: Introductionmentioning