2014
DOI: 10.4236/am.2014.515221
|View full text |Cite
|
Sign up to set email alerts
|

Predispatch of Hydroelectric Power Systems with Modifications in Network Topologies

Abstract: In this article, the primal-dual interior-point methods are used to minimize costs and losses in a predispatch model for the generation and transmission of direct current (DC) power flow in a hydroelectric system with pre-programmed manipulations; i.e., in cases of preventive maintenance, within a period of twenty-four hours. From the computational standpoint, the effort required to solve a problem with and without manipulations is similar, and the reasons will be also discussed in this study. Computational re… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0
1

Year Published

2016
2016
2016
2016

Publication Types

Select...
1
1

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 14 publications
0
0
0
1
Order By: Relevance
“…Quando uma manobra de linha é realizada, um ramo é retirado do sistema, e modifica-se a topologia da rede. Neste caso, uma coluna da matriz de incidência (referente ao ramo manobrado) e uma linha da matriz de reatância são retiradas [11,12,13,14,15].…”
Section: Manobras De Linhaunclassified
“…Quando uma manobra de linha é realizada, um ramo é retirado do sistema, e modifica-se a topologia da rede. Neste caso, uma coluna da matriz de incidência (referente ao ramo manobrado) e uma linha da matriz de reatância são retiradas [11,12,13,14,15].…”
Section: Manobras De Linhaunclassified