AC operation with multiple full cycles has been successfully performed on the superconducting tokamak HT-7. In the experiment, it was discovered that the saturation of the transformer magnetic flux with DEF, a signal name, was one of key aspects that affected the AC operation. The conditions of DEF were examined through the DEF feedback control system. By controlling the working patterns of the subsystems, namely the poloidal field control system and density control system, it was guaranteed that DEF would remain in the non-saturated status.