1997
DOI: 10.1016/s0266-1144(98)80008-3
|View full text |Cite
|
Sign up to set email alerts
|

Preliminary results of composite liner field performance study

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
6
0
1

Year Published

2000
2000
2023
2023

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 18 publications
(7 citation statements)
references
References 1 publication
0
6
0
1
Order By: Relevance
“…In soil mechanics, it is common to employ an idealized description of virgin compression where it is assumed that the void ratio is a linear function of the logarithm of the effective stress [17], i.e. e = e p −C c log p (5) where e p and p are the void ratio and effective stress values, respectively, corresponding to the preconsolidation stress and C c is the compression index of the soil (defined by the absolute value of the slope of the idealized virgin compression line).…”
Section: Constitutive Relationsmentioning
confidence: 99%
See 2 more Smart Citations
“…In soil mechanics, it is common to employ an idealized description of virgin compression where it is assumed that the void ratio is a linear function of the logarithm of the effective stress [17], i.e. e = e p −C c log p (5) where e p and p are the void ratio and effective stress values, respectively, corresponding to the preconsolidation stress and C c is the compression index of the soil (defined by the absolute value of the slope of the idealized virgin compression line).…”
Section: Constitutive Relationsmentioning
confidence: 99%
“…Despite the widespread use of diffusion only models and a rigid soil, some field data for composite barriers have indicated that the transit time of VOCs is much less than the transit time that can be explained by diffusion alone [5,6]. Furthermore, higher than expected liquid flow rates into secondary leachate collection systems (SLCSs) have been attributed to 'consolidation water' being expelled from the overlying liner [7,8].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Even more recently, the US EPA, recognizing the need for comments, held a workshop in Arlington, VA (Sept. [6][7]2000) on needs and regulatory issues associated with implementation of "controlled" or "bioreactor" landfills. Proceedings of this workshop are promised and should be forthcoming shortly from ERG, Inc, of Lexington, Massachusetts.…”
Section: Epa Workhop On Landfill Bioreactorsmentioning
confidence: 99%
“…Even more recently, the US EPA, recognizing the need for comments, held a workshop in Arlington, VA (Sept. [6][7]2000) on needs and regulatory issues associated with implementation of "controlled" or "bioreactor" landfills. Proceedings of this workshop are promised and should be forthcoming shortly from ERG, Inc, of Lexington, Massachusetts.…”
Section: Epa Workhop On Landfill Bioreactorsmentioning
confidence: 99%