2019
DOI: 10.1016/j.ijmachtools.2018.09.002
|View full text |Cite
|
Sign up to set email alerts
|

Pretightening sequence planning of anchor bolts based on structure uniform deformation for large CNC machine tools

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
11
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 22 publications
(11 citation statements)
references
References 19 publications
0
11
0
Order By: Relevance
“…erefore, the dynamic evolution over time should be considered when conducting maintenance and geometric error compensation. e geometric accuracy also acts as a quasistatic accuracy that gradually declines over time and thus shows strong time-correlation behaviour [33]. In this paper, the geometric error of dynamic change is mapped to the time dimension and transformed into a timeindependent index.…”
Section: Accuracy Retentivity Modelmentioning
confidence: 99%
See 1 more Smart Citation
“…erefore, the dynamic evolution over time should be considered when conducting maintenance and geometric error compensation. e geometric accuracy also acts as a quasistatic accuracy that gradually declines over time and thus shows strong time-correlation behaviour [33]. In this paper, the geometric error of dynamic change is mapped to the time dimension and transformed into a timeindependent index.…”
Section: Accuracy Retentivity Modelmentioning
confidence: 99%
“…e longer the time is, the better the accuracy retentivity of the machine tool is, and the opposite case also holds. However, aiming at the problems of the accuracy variations of machine tools, most studies have focused on the accuracy degradation and accuracy reliability evaluation caused by the wearing of guideways, bolt relaxation, and stress relaxation-induced deformation of machine bodies [29,[31][32][33]. It is obvious that all of these factors reduce the geometric accuracy gradually, which affects the geometric accuracy retentivity in an essential way [34].…”
Section: Introductionmentioning
confidence: 99%
“…The estimated stiffness coefficients may depend not only on the properties of the physical structures, but also on the values of pretension of the individual supports. Even the order in which those supports have been adjusted can be an important factor (Liu et al, 2019). Moreover, the number of stiffness coefficients estimated may be too high to apply analytical optimization techniques.…”
Section: Introductionmentioning
confidence: 99%
“…Liu et al [3] use the ABAQUS software to simulate the bolt up process on the assembly structure. Wang and Liu et al [4,5] investigated the tightening sequence of anchor bolts for large CNC machine tools by using the simulation and experiments. Based on the simulation results, tightening sequence from middle to sides could generate uniform deformation of machine bed.…”
Section: Introductionmentioning
confidence: 99%
“…Pretension forceTightening the bolts generate the pretension force in the bolts. The pretension force or tightening force can be calculated by equation 1[5,10] force (N) T = torque (N-m) d = diameter of bolts (m)In this study, different diameter of bolts and torque are used to tight the two components in the column, linear guideway and anchor bolts. The bolts which use in the column structure is the M30 (diameter is 30 mm) and the torque is 776 N-m.…”
mentioning
confidence: 99%