Primary Frequency Regulation of Intelligent Building-type Virtual Power Plant

Abstract: In order to cope with the impact of intelligent building-type virtual power plant on system frequency, this paper proposes a primary frequency control strategy. Firstly, a typical demand-side resource model of intelligent building-type virtual power plant is established, which considers the travel uncertainty of electric vehicles and resident’s comfort preference. Secondly, the control parameters of electric vehicles and air-conditioning loads are designed respectively, and a control strategy based on variable… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(4 citation statements)
references
References 3 publications
0
4
0
Order By: Relevance
“…7 In this regard, the CVPP collects each DER's bid prices, up-down frequency reserves, ramp rate, and activation delay at different time scales for the next day or an hour. [9][10][11][12][13][14] To maximize each DER's profit, the CVPP also receives market-related data like price forecasts from the market operator and generates an optimal schedule for activating DERs. 7 Reliable data mining tools and effective computational strategies are deployed to prepare an optimal schedule for bidding in the FC-AS market.…”
Section: Literature Reviewmentioning
confidence: 99%
See 3 more Smart Citations
“…7 In this regard, the CVPP collects each DER's bid prices, up-down frequency reserves, ramp rate, and activation delay at different time scales for the next day or an hour. [9][10][11][12][13][14] To maximize each DER's profit, the CVPP also receives market-related data like price forecasts from the market operator and generates an optimal schedule for activating DERs. 7 Reliable data mining tools and effective computational strategies are deployed to prepare an optimal schedule for bidding in the FC-AS market.…”
Section: Literature Reviewmentioning
confidence: 99%
“…25 Thus, the TVPP central operator is responsible for determining these droop and dead-band parameters by collecting the status of DERs in near real-time before delivering the activation signals. 10,11 After obtaining the updated frequency control capability of all DERs, the TVPP operator dispatches the request signal for activation to different DERs to satisfy the required flexibility of the grid. 28,29 Then, the activation phase of adjusting the generation of DER units starts after the TVPP operator receives each DER unit's confirmation signal.…”
Section: Background Perspectivementioning
confidence: 99%
See 2 more Smart Citations