2019
DOI: 10.1063/1.5090754
|View full text |Cite
|
Sign up to set email alerts
|

Priority-based intelligent allocation scheduling model

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
2
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 1 publication
0
2
0
Order By: Relevance
“…Figure 2 shows the schematic diagram of this material processing system (Table 1). The operating parameters of this material processing system are derived from the latest available literature [10][11][12][13]. 1: 3 sets of data sheets for intelligent processing system operating parameters.…”
Section: System Operation Parametersmentioning
confidence: 99%
See 1 more Smart Citation
“…Figure 2 shows the schematic diagram of this material processing system (Table 1). The operating parameters of this material processing system are derived from the latest available literature [10][11][12][13]. 1: 3 sets of data sheets for intelligent processing system operating parameters.…”
Section: System Operation Parametersmentioning
confidence: 99%
“…The CNC may malfunction during the machining process (the probability of failure is about 1%). It takes 10 to 20 minutes for each manual failure (unfinished material scrap) [12][13][14]. After the troubleshooting, the CNC immediately joins the sequence.…”
mentioning
confidence: 99%