2022
DOI: 10.1016/j.epsr.2022.108379
|View full text |Cite
|
Sign up to set email alerts
|

Probabilistic operational planning using dynamic programming with time-domain simulations

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
8
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3

Relationship

2
1

Authors

Journals

citations
Cited by 3 publications
(8 citation statements)
references
References 10 publications
0
8
0
Order By: Relevance
“…Alternative methods to [4] for probabilistic operational planning have been presented in the literature [5]- [9]. In [5] a DC power flow was used to include power system response in a probabilistic operational planning model.…”
Section: B Related Workmentioning
confidence: 99%
See 4 more Smart Citations
“…Alternative methods to [4] for probabilistic operational planning have been presented in the literature [5]- [9]. In [5] a DC power flow was used to include power system response in a probabilistic operational planning model.…”
Section: B Related Workmentioning
confidence: 99%
“…Moreover, the time domain characteristic of protection systems cannot be included. In the proposed approach, a GCN is trained to predict the result of a detailed time-domain simulation that calculates the cost of operating a power system given a set of preventive and corrective actions while considering the time-domain characteristics of protection systems [4].…”
Section: B Related Workmentioning
confidence: 99%
See 3 more Smart Citations