CIRED 2012 Workshop: Integration of Renewables Into the Distribution Grid 2012
DOI: 10.1049/cp.2012.0741
|View full text |Cite
|
Sign up to set email alerts
|

Procedure for optimal sizing and locating distributed generator according network losses and protection constraints

Abstract: This paper introduces a procedure for sizing and locating Distributed Generator (DG) in order to loss reduction considering protection coordination constraints. Proposed method of the paper is a mixing of two different issues. One network losses and the other are impacts of DG on network protection. The procedure is useful in finding optimal size and location of DG that after installing to the primary distribution network lead to reducing active power losses of the network while satisfying protection constrain… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 6 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?