2007
DOI: 10.18000/ijies.30015
|View full text |Cite
|
Sign up to set email alerts
|

Process Simulation of Nuclear Power Plant Using Latest Techniques

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
5
0

Year Published

2011
2011
2017
2017

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(5 citation statements)
references
References 0 publications
0
5
0
Order By: Relevance
“…The simulator is essentially made up of mathematical models of PFBR subsystems running in a computer system in real time and actual sequence to replicate the operational characteristics of the plant. PFBR Training Simulator is designed to simulate the steady state and dynamic responses of the plant to operator actions in real-time [6]. The simulator is helpful in training the operators about the process dynamics, operations in normal and abnormal situations, various malfunctions & incidents, plant start-up etc.…”
Section: Full Scope Replica Simulatormentioning
confidence: 99%
“…The simulator is essentially made up of mathematical models of PFBR subsystems running in a computer system in real time and actual sequence to replicate the operational characteristics of the plant. PFBR Training Simulator is designed to simulate the steady state and dynamic responses of the plant to operator actions in real-time [6]. The simulator is helpful in training the operators about the process dynamics, operations in normal and abnormal situations, various malfunctions & incidents, plant start-up etc.…”
Section: Full Scope Replica Simulatormentioning
confidence: 99%
“…Training simulators help owners of industries, especially power utilities, to train their operating staff effectively (IAEA-TECDOC-1411, 2004; Kazuya et al , 2009). Full-scope training simulators with replicated control rooms and mathematical models mimicking the entire plant are being used extensively to train control room operators (Bindu et al , 2011; Jayanti et al , 2007; IAEA-TECDOC-1411, 2004). Power plants operate in various operating conditions with respect to power demands and various equipment operating limitations.…”
Section: Introductionmentioning
confidence: 99%
“…Thermal and nuclear power plants use a range of saturated steam water space (SSWS) equipment, and mathematical models of these pieces of equipment are an important component of thermal and nuclear power plant simulators (Philip et al ., 2014a; Kumar and Kumar, 2014; Nag, 2014). With many SSWS being encountered in most thermal and nuclear power plants, it is important to devise suitable modeling techniques for modeling SSWS equipment (Jayanti et al , 2007; Kumar and Kumar, 2014; IAEA-TECDOC-1411, 2004).…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…In the present scenario, Full Scope Replica Simulator has become a main component of the operator training programme in Nuclear Power Plant. The replicated control room representing the main control room is used for training the operators to increase the skill sets by providing simulator environment for overall monitoring and control of the plant [1,2]. The operators are trained to operate Main Control Room, Handling Control Room and Backup Control Room for various purposes in the plant.…”
Section: Introductionmentioning
confidence: 99%