Process-wide integration of solvent mixtures

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
9
0

Year Published

2007
2007
2018
2018

Publication Types

Select...
4
3
1

Relationship

2
6

Authors

Journals

citations
Cited by 18 publications
(9 citation statements)
references
References 5 publications
0
9
0
Order By: Relevance
“…Here, however, the primary objective is considered much more important than the secondary objective. Therefore, a single Pareto-optimal point is obtained, by first minimizing the primary objective and then the secondary objective by requiring that the former (more important) objectives are not worsened, see also [51] [53] .…”
Section: Methodsmentioning
confidence: 99%
“…Here, however, the primary objective is considered much more important than the secondary objective. Therefore, a single Pareto-optimal point is obtained, by first minimizing the primary objective and then the secondary objective by requiring that the former (more important) objectives are not worsened, see also [51] [53] .…”
Section: Methodsmentioning
confidence: 99%
“…In recent years, there has been an increased interest for continuous production of APIs, for example driven by the real-time-release concept introduced in the PAT guidance (FDA, 2004). Computer-aided methods and tools form the cornerstone of the methodology, and can/may be used for flowsheet generation (Chakraborty and Linninger, 2002;Jaksland et al, 1995), solvent selection and replacement (Gani et al, 2008), as well as solvent integration (Ahmad and Barton, 1999). When developing such plants, it is evident that property prediction and process design methods, which are both wellestablished in the PSE community as well as in industry, will be required.…”
Section: Development Of Continuous Production Processesmentioning
confidence: 99%
“…Moreover, there are multiple objectives for the operation of the system. This feature of the problem can be leveraged to obtain a solution that maximizes several objectives in a hierarchical way 55. Obtaining a Pareto‐optimal solution for this problem is unnecessary (as well as prohibitively expensive due to nonconvexity) because there is a clear hierarchy of objectives as follows: The first priority is to supply the required amount of dry gas (represented by the maximum demand rates at the LNG plants), since this is mandated by PSC.…”
Section: Hierarchical Multi‐objective Case Studymentioning
confidence: 99%