2011
DOI: 10.1016/j.indmarman.2010.09.007
|View full text |Cite
|
Sign up to set email alerts
|

Procurement cost reduction for customized non-critical items in an automotive supply chain: An action research project

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0
3

Year Published

2013
2013
2018
2018

Publication Types

Select...
8
2

Relationship

3
7

Authors

Journals

citations
Cited by 21 publications
(10 citation statements)
references
References 48 publications
0
7
0
3
Order By: Relevance
“…AR aims to challenge the status quo and originates from the need to solve practical, and complex social problems (Lewin, 1947). Recent AR research in the PSM field has explored problems related to sustainable practices in supply networks (Golob et al, 2014, Touboulic andWalker, 2015), decision making for New Product Development (Le Dain et al, 2010), strategic supplier performance evaluation (Dey et al, 2015) and the establishment of direct and cheaper procurement processes (Pereira et al, 2011).…”
Section: The Case For Action Researchmentioning
confidence: 99%
“…AR aims to challenge the status quo and originates from the need to solve practical, and complex social problems (Lewin, 1947). Recent AR research in the PSM field has explored problems related to sustainable practices in supply networks (Golob et al, 2014, Touboulic andWalker, 2015), decision making for New Product Development (Le Dain et al, 2010), strategic supplier performance evaluation (Dey et al, 2015) and the establishment of direct and cheaper procurement processes (Pereira et al, 2011).…”
Section: The Case For Action Researchmentioning
confidence: 99%
“…This means that the OEMs have shifted their focus from handling a large number of parts toward the assembly of entire modules, which are delivered directly from a significantly smaller number of suppliers than before [15]. Furthermore the suppliers could be divided into the categories of primary (first-tier), secondary (second-tier) and tertiary (third-tier to n-tier) subcontractors by the OEMs [16].…”
Section: Figure 1 Vw Engine Production Facilities All Over the Worldmentioning
confidence: 99%
“…Efetivamente, SI pode promover rapidez, agilidade e segurança às transações requeridas pela manufatura, atendendo às necessidades externas do mercado e internas do chão de fábrica (BARRETO et al, 2005;PEREIRA et al, 2011). Pode, entre outras vantagens, auxiliar no aumento da flexibilidade e proporcionar agilidade na execução de operações (FAORO; ABREU, 2014).…”
Section: Mes (Manufacturing Execution System)unclassified