Day 2 Tue, August 03, 2021 2021
DOI: 10.2118/207094-ms
|View full text |Cite
|
Sign up to set email alerts
|

Produced Water Disposal in Deep Aquifers: Case History Review of Ughelli East-30 Pilot Injector

Abstract: A water injector pilot well - Ughelli East-30, was drilled across high-permeability unconsolidated sandstone aquifers to dispose 30 Mbwpd of produced water in November 1998 and suspended in December 1998 due to lack of injectivity. Review of the failed pilot injection was performed as part of an extensive water management study for a cluster of onshore fields located in the western Niger Delta area. The technical investigation focused on the target disposal aquifer petrophysical parameters, prod… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 6 publications
0
1
0
Order By: Relevance
“…Reinjecting generated water into porous and permeable subsurface formations, including the reservoir interval where the oil and water originally came from, was first practiced in the 1920s. Reinjection of generated water into an oilfield was widely used by the 1930s [7].…”
mentioning
confidence: 99%
“…Reinjecting generated water into porous and permeable subsurface formations, including the reservoir interval where the oil and water originally came from, was first practiced in the 1920s. Reinjection of generated water into an oilfield was widely used by the 1930s [7].…”
mentioning
confidence: 99%