All Days 2012
DOI: 10.2118/150369-ms
|View full text |Cite
|
Sign up to set email alerts
|

Production Gain and Optimization through the Implementation of Smart Well Completion Technology in Saudi Aramco, Case Study

Abstract: Saudi Aramco operates a field located in a remote area in Saudi Arabia. The field is equipped with measurement, communication, control and software systems allowing real-time automated field management. It has the highest number of smart well completion installations in Saudi Aramco with 78 smart wells and 135 permanent downhole monitoring systems (PDHMS). The smart completion ensures controlled flow contribution from each targeted area within the reservoir, unlike open hole multilaterals where the inflow of o… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2012
2012
2023
2023

Publication Types

Select...
3
3

Relationship

0
6

Authors

Journals

citations
Cited by 14 publications
(6 citation statements)
references
References 5 publications
0
5
0
Order By: Relevance
“…After determining the productivity indices of the laterals several combinations of ICV openings are performed to meet the best production performance while maintaining the best reservoir management practices. 2 The following production optimization achievements were accomplished during a smart wells production optimization campaign:…”
Section: Current Optimization Methodology and Achieved Benefitsmentioning
confidence: 99%
See 1 more Smart Citation
“…After determining the productivity indices of the laterals several combinations of ICV openings are performed to meet the best production performance while maintaining the best reservoir management practices. 2 The following production optimization achievements were accomplished during a smart wells production optimization campaign:…”
Section: Current Optimization Methodology and Achieved Benefitsmentioning
confidence: 99%
“…The strong lateral was restricted to position 7 and the productivity indices were balanced across the laterals. 2 The optimization process was performed purely by trial and error and common sense while changing the ICV opening and closing combinations and pressure monitoring. The next section in this paper describes how the optimization practices were taken to a new level for simulating the flow utilizing the Netool program.…”
Section: Pi Variationmentioning
confidence: 99%
“…Downhole measurement (pressures and/or rates) is a virtual necessity for model history matching and calibration when seeking to use a proactivemanagement approach. Many of the early FCV installations in Saudi Arabia were not equipped with pressure gauges, and thus required rigorous testing of every lateral or segment to optimize performance (Mubarak et al 2009;Zarea and Zhu 2011;Al-Dossary et al 2012). Numerous examples of reactive well management exist, including cases in Shaybah where FCVs enabled the reduction of water cut or gas/oil ratio while maintaining or increasing oil production (Al-Dossary et al 2012).…”
Section: Maximum-and Extreme-reservoir-contact-wells Backgroundmentioning
confidence: 99%
“…Many of the early FCV installations in Saudi Arabia were not equipped with pressure gauges, and thus required rigorous testing of every lateral or segment to optimize performance (Mubarak et al 2009;Zarea and Zhu 2011;Al-Dossary et al 2012). Numerous examples of reactive well management exist, including cases in Shaybah where FCVs enabled the reduction of water cut or gas/oil ratio while maintaining or increasing oil production (Al-Dossary et al 2012). Once again, the optimization process can be quite cumbersome because individual and commingled lateral tests are required at various FCV settings.…”
Section: Maximum-and Extreme-reservoir-contact-wells Backgroundmentioning
confidence: 99%
See 1 more Smart Citation