2018
DOI: 10.15407/mining12.02.116
|View full text |Cite
|
Sign up to set email alerts
|

Production of hydrocarbons from weakly consolidated sandstone reservoirs in the Croatian part of the Pannonian Basin System

Abstract: Purpose. More efficient production of hydrocarbons from weakly consolidated sandstone reservoirs using improved method. Modification of the equipment according to the geological characteristics of the reservoir and the mode of production.Methods. Perforation is performed with two different types of charges (DP & BH), after that the modified gravel pack equipment is run in hole.Findings. The combination of double perforation and the application of modified gravel pack allows for more efficient hydrocarbons prod… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 6 publications
0
3
0
Order By: Relevance
“…The costs also include equipment maintenance. In case of the occurrence of sand during the production of hydrocarbons for the Klostar Ivanic Formation, according to [26,27], continuous production of hydrocarbons is ensured, and thus in the model the given production time. The observed period is 10 years, and desired response in recovered fluid has been set at 0.5%, 1% and 2%.…”
Section: Risk-neutral Value For Future Water Injectionmentioning
confidence: 99%
“…The costs also include equipment maintenance. In case of the occurrence of sand during the production of hydrocarbons for the Klostar Ivanic Formation, according to [26,27], continuous production of hydrocarbons is ensured, and thus in the model the given production time. The observed period is 10 years, and desired response in recovered fluid has been set at 0.5%, 1% and 2%.…”
Section: Risk-neutral Value For Future Water Injectionmentioning
confidence: 99%
“…The costs also included equipment maintaining. In case of occurrence of sand during the production of hydrocarbons for Klostar Ivanic Formation, according to [23,24], continuous production of hydrocarbons is ensured, and thus in the model the given production time. The observed period in 10 years and asked response in recovered fluid has been set at 0.5, 1 and 2 %.…”
Section: Risk Neutral Value For Future Water Injectionmentioning
confidence: 99%
“…Most problems are being caused by sand infl ux into the well, which leads to equipment erosion, bottom-hole collapses and may result in well control incident. A lot of researches were made for accompanies of this problem -petrophysical, rheological and hydromechanical papers give wide performance about it (Hall, 1970;Naveed, 2009;Ivšinović, 2018;Vieira and Jureszik, 2019).…”
Section: Introductionmentioning
confidence: 99%