The Changbei gas field is dominated by wells with large horizontal displacement, which have exhibited high gas production performance at an early stage of development. With the decrease in reservoir pressure, the liquid loading in the gas well is relatively high and gas production rapidly decreases. Therefore, suitable drainage measures are required to maintain stable gas production. Based on the characteristics of the unconnected oil jacket of gas wells in Changbei, a velocity string was used for drainage. A critical liquid-carrying model was established to determine the location of liquid loading in horizontal gas wells in Changbei. First, the coefficients of the liquid-carrying model were determined through theoretical analysis of the characteristics of the gas well formation. Then, the depth setting of the velocity string was analyzed. The critical liquid-carrying model was employed to calculate the liquid-carrying flow rate of each section; the calculated flow rates were compared with the actual flow rates to determine whether fluid accumulation occurred in each section of the gas well. Thereafter, with the help of the oil and casing position, the suitable setting position of the velocity string was determined. The formation fluid was driven from the tubing into the casing owing to the increase in the overflow area, based on the principle of reducer fluid mechanics. The fluid velocity in the larger overflow cross-section decreased, thereby reducing the drainage capacity of the gas well and resulting in liquid loading. Finally, a timing analysis was performed. After the formation pressure decreased, the well production and flow rate changes were analyzed by placing two velocity strings of different sizes at different wellhead pressures in the gas well with fluid accumulation. The results indicated that although the velocity string was set at a position suitable for fluid drainage, fluid accumulation still occurred after a production period, thus necessitating replacement deliquification.