2020
DOI: 10.1155/2020/8845270
|View full text |Cite
|
Sign up to set email alerts
|

Productivity Evaluation for Long Horizontal Well Test in Deep-Water Faulted Sandstone Reservoir

Abstract: For deep-water faulted sandstone reservoirs, the general practice is to design long horizontal wells improving well productivity. During the project implementation stage, well tests are performed on all drilled wells to evaluate well productivity accurately. Furthermore, multisize chokes are often utilized in a shorten test time for loosen formation, high test cost, and high well productivity. Nevertheless, the conventional productivity evaluation approach cannot accurately evaluate the well test productivity … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 14 publications
0
1
0
Order By: Relevance
“…Currently, the existing production analysis methods mainly include production profile testing, physical simulating experiments, formation coefficient splitting method, theoretical analytical formulas, and numerical simulations [12][13][14][15][16][17][18][19]. These methods mainly use the original geological interpreted formation data to predict the productivity of a well, which lacks a detailed description of the sand control tube and cannot dynamically predict the productivity loss caused by sand blockage.…”
Section: Introductionmentioning
confidence: 99%
“…Currently, the existing production analysis methods mainly include production profile testing, physical simulating experiments, formation coefficient splitting method, theoretical analytical formulas, and numerical simulations [12][13][14][15][16][17][18][19]. These methods mainly use the original geological interpreted formation data to predict the productivity of a well, which lacks a detailed description of the sand control tube and cannot dynamically predict the productivity loss caused by sand blockage.…”
Section: Introductionmentioning
confidence: 99%